Please check your email .
Nexum Group require 4 dryliner/partitioners to start on Monday 9th September on a hospital project in North East London.
Work involves creating 10 individual wards approx 3m x 3.5m and 3.3m high. Installing metal frame studwork, one skin of 12 mm ply and 12mm board. It will be finished in plaster so no need to tape and joint. It's all laid out on the floor and drawings provided. Plus the site manager is on hand to assist with setting out.
This first run of work is for 2 weeks and if you are willing and can turn your hand to other interior work, the work will run to end of October and then extended to summer 2025.
We are happy to discuss an increase in the rate in exceptional circumstances and for the right candidates.
You will be working for a very important client to Nexum and reliability on both attendance and your capability to install is of the utmost importance to us.
Please apply within and if you have any questions.do not hesitate to contact us.
Pro Contract Jobs
Sterling House,
East Wing, Suit 310E,
Langston Road,
Loughton, IG10 3TS.
Phone No: 0203 371 1252
2024 © Pro Contract Jobs. ALL Rights Reserved.
Powered by: Talenetic Job Board Software