Please check your email .
PTS Electricians needed to jump on Railway project.
Farncombe to Petersfield
Requriements:
18th edition
PTS
ECS/JIBOutline of work:
Installation of new 3kva transformer within the new FSP already on-site
The 3kva transformer will either be swapped for a 1.5kva transformer or if there is enough space within the FSP the transformer and associated wiring shall be installed
The purpose of the new transformer is to change the existing SMIEOH DB from IT to TN system
Installation of a new 1cu10mm earth cable between the FSP and SMIEOH DB
Installation of a new 1cu35mm earth cable between the FSP earth bar and SMIEOH earth bar
Undertake Telecom Rack Battery Installation
Undertake Telecom Rack Battery Cable Testing
Undertake Telecom Rack Battery Discharge Testing
Undertake Telecom Rack Battery Impedance and Voltage Measurements Test
Carry out an alteration to an existing circuit certificate and relevant testing associated with this
For more information please contact Fred Kilburn at (phone number removed)
Pro Contract Jobs
Sterling House,
East Wing, Suit 310E,
Langston Road,
Loughton, IG10 3TS.
Phone No: 0203 371 1252
2024 © Pro Contract Jobs. ALL Rights Reserved.
Powered by: Talenetic Job Board Software